Home / Products / Special Purpose Regulators / Monolithic Power Systems Inc. / MPQ4488BGU-AEC1-Z

Monolithic Power Systems Inc. MPQ4488BGU-AEC1-Z

36V, 6A, STEP-DOWN CONVERTER WIT

Answer first: this page is a purchasing reference for the exact part number MPQ4488BGU-AEC1-Z from Monolithic Power Systems Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Monolithic Power Systems Inc. Category: Special Purpose Regulators Part number: MPQ4488BGU-AEC1-Z Package: 26-PowerVFQFN RFQ verification required

Key Parameters

Part NumberMPQ4488BGU-AEC1-Z
ManufacturerMonolithic Power Systems Inc.
CategorySpecial Purpose Regulators
package26-PowerVFQFN
series-
packagingTape & Reel (TR)
product statusActive
param 1Converter, USB
param 236V
param 33
param 45.1V, 5.17V, 5.3V
param 5-40°C ~ 125°C (TJ)
param 6Automotive
param 7AEC-Q100
param 8Surface Mount
param 926-QFN (5x5)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify MPQ4488BGU-AEC1-Z Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For MPQ4488BGU-AEC1-Z, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.