Home / Products / DC DC Switching Controllers / National Semiconductor / LM3000ASQ/NOPB

National Semiconductor LM3000ASQ/NOPB

SWITCHING REGULATOR/CONTROLLER

Answer first: this page is a purchasing reference for the exact part number LM3000ASQ/NOPB from National Semiconductor. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: National Semiconductor Category: DC DC Switching Controllers Part number: LM3000ASQ/NOPB Package: 32-WFQFN Exposed Pad RFQ verification required

Key Parameters

Part NumberLM3000ASQ/NOPB
ManufacturerNational Semiconductor
CategoryDC DC Switching Controllers
package32-WFQFN Exposed Pad
series-
packagingBulk
product statusObsolete
param 1Transistor Driver
param 2Step-Down
param 3Positive
param 4Buck
param 52
param 62
param 73.3V ~ 5.5V
param 8200kHz ~ 1.5MHz
param 985%
param 10Yes
param 11Yes
param 12-
param 13Current Limit, Enable, Frequency Control, Power Good, Soft Start, Tracking
param 14-40°C ~ 125°C (TJ)
param 15-
param 16-
param 17Surface Mount
param 1832-WQFN (5x5)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify LM3000ASQ/NOPB Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For LM3000ASQ/NOPB, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.