Home / Products / Voltage Reference / National Semiconductor / LM4040EIM7-3.0/NOPB

National Semiconductor LM4040EIM7-3.0/NOPB

VOLTAGE REFERENCE

Answer first: this page is a purchasing reference for the exact part number LM4040EIM7-3.0/NOPB from National Semiconductor. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: National Semiconductor Category: Voltage Reference Part number: LM4040EIM7-3.0/NOPB Package: 5-TSSOP, SC-70-5, SOT-353 RFQ verification required

Key Parameters

Part NumberLM4040EIM7-3.0/NOPB
ManufacturerNational Semiconductor
CategoryVoltage Reference
package5-TSSOP, SC-70-5, SOT-353
series-
packagingBulk
product statusActive
param 1Shunt
param 2Fixed
param 33V
param 4-
param 515 mA
param 6±2%
param 7150ppm/°C
param 8-
param 935µVrms
param 10-
param 11-
param 1270 µA
param 13-40°C ~ 85°C (TA)
param 14Automotive
param 15AEC-Q100
param 16Surface Mount
param 17SC-70-5

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify LM4040EIM7-3.0/NOPB Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For LM4040EIM7-3.0/NOPB, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.