National Semiconductor LM4570LQ/NOPB
LM4570 SINGLE-ENDED INPUT MOTOR
Answer first: this page is a purchasing reference for the exact part number LM4570LQ/NOPB from National Semiconductor. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | LM4570LQ/NOPB |
|---|---|
| Manufacturer | National Semiconductor |
| Category | Motor Drivers, Controllers |
| package | 8-WQFN Exposed Pad |
| series | - |
| packaging | Bulk |
| product status | Active |
| param 1 | - |
| param 2 | Brushed DC |
| param 3 | Driver - Fully Integrated, Control and Power Stage |
| param 4 | Half Bridge (2) |
| param 5 | Parallel |
| param 6 | Power MOSFET |
| param 7 | - |
| param 8 | General Purpose |
| param 9 | 192mA |
| param 10 | 2.4V ~ 5.5V |
| param 11 | 2.4V ~ 5.5V |
| param 12 | -40°C ~ 150°C (TJ) |
| param 13 | - |
| param 14 | - |
| param 15 | Surface Mount |
| param 16 | 8-WQFN (2x2) |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify LM4570LQ/NOPB Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For LM4570LQ/NOPB, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.