Home / Products / DC DC Switching Controllers / National Semiconductor / LM5025BSD

National Semiconductor LM5025BSD

SWITCHING CONTROLLER, VOLTAGE-MO

Answer first: this page is a purchasing reference for the exact part number LM5025BSD from National Semiconductor. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: National Semiconductor Category: DC DC Switching Controllers Part number: LM5025BSD Package: 16-WFDFN Exposed Pad RFQ verification required

Key Parameters

Part NumberLM5025BSD
ManufacturerNational Semiconductor
CategoryDC DC Switching Controllers
package16-WFDFN Exposed Pad
series-
packagingBulk
product statusActive
param 1Transistor Driver
param 2Step-Up/Step-Down
param 3Positive, Isolation Capable
param 4Forward Converter
param 52
param 61
param 78V ~ 15V
param 8200kHz ~ 400kHz
param 971%, 73%
param 10No
param 11Yes
param 12-
param 13Dead Time Control, Frequency Control, Ramp, Soft Start
param 14-40°C ~ 125°C (TJ)
param 15-
param 16-
param 17Surface Mount
param 1816-WSON (5x5)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify LM5025BSD Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For LM5025BSD, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.