Home / Products / Instrumentation, Op Amps, Buffer Amps / National Semiconductor / LMV110M7

National Semiconductor LMV110M7

IC OPAMP GP 1 CIRCUIT SC70-5

Answer first: this page is a purchasing reference for the exact part number LMV110M7 from National Semiconductor. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: National Semiconductor Category: Instrumentation, Op Amps, Buffer Amps Part number: LMV110M7 Package: 5-TSSOP, SC-70-5, SOT-353 RFQ verification required

Key Parameters

Part NumberLMV110M7
ManufacturerNational Semiconductor
CategoryInstrumentation, Op Amps, Buffer Amps
package5-TSSOP, SC-70-5, SOT-353
series-
packagingBulk
product statusObsolete
param 1General Purpose
param 21
param 3Rail-to-Rail
param 41V/µs
param 5-
param 6200 kHz
param 7-
param 8-
param 9130µA
param 10-
param 112.7 V
param 125 V
param 13-40°C ~ 85°C
param 14-
param 15-
param 16Surface Mount
param 17SC-70-5

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify LMV110M7 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For LMV110M7, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.