Home / Products / Clock Generators, PLLs, Frequency Synthesizers / National Semiconductor / LMX2332USLEX

National Semiconductor LMX2332USLEX

IC PLL FREQ SYNTH 20ULGA

Answer first: this page is a purchasing reference for the exact part number LMX2332USLEX from National Semiconductor. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: National Semiconductor Category: Clock Generators, PLLs, Frequency Synthesizers Part number: LMX2332USLEX Package: 20-UFLGA RFQ verification required

Key Parameters

Part NumberLMX2332USLEX
ManufacturerNational Semiconductor
CategoryClock Generators, PLLs, Frequency Synthesizers
package20-UFLGA
seriesPLLatinumâ„¢
packagingBulk
product statusActive
param 1Not Verified
param 2PLL Frequency Synthesizer
param 3Yes with Bypass
param 4CMOS, TTL
param 5CMOS
param 61
param 73:1
param 8Yes/No
param 91.2GHz, 600MHz
param 10Yes/No
param 112.7V ~ 5.5V
param 12-40°C ~ 85°C
param 13Surface Mount
param 14-
param 15-
param 1620-ULGA (3.5x3.5)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify LMX2332USLEX Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For LMX2332USLEX, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.