Home / Products / FETs, MOSFETs / Nexperia USA Inc. / PMZB290UN,315

Nexperia USA Inc. PMZB290UN,315

MOSFET N-CH 20V 1A DFN1006B-3

Answer first: this page is a purchasing reference for the exact part number PMZB290UN,315 from Nexperia USA Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Nexperia USA Inc. Category: FETs, MOSFETs Part number: PMZB290UN,315 Package: 3-XFDFN RFQ verification required

Key Parameters

Part NumberPMZB290UN,315
ManufacturerNexperia USA Inc.
CategoryFETs, MOSFETs
package3-XFDFN
series-
packagingTape & Reel (TR)
product statusDiscontinued at Digi-Key
param 1N-Channel
param 2MOSFET (Metal Oxide)
param 320 V
param 41A (Ta)
param 51.8V, 4.5V
param 6380mOhm @ 500mA, 4.5V
param 7950mV @ 250µA
param 80.68 nC @ 4.5 V
param 9±8V
param 1083 pF @ 10 V
param 11-
param 12360mW (Ta), 2.7W (Tc)
param 13-55°C ~ 150°C (TJ)
param 14-
param 15-
param 16Surface Mount
param 17DFN1006B-3

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify PMZB290UN,315 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For PMZB290UN,315, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.