Home / Products / Omron Electronics Inc-EMC Div / D3V-6G2-1C24-K

Omron Electronics Inc-EMC Div D3V-6G2-1C24-K

SWITCH SNAP ACTION SPDT 6A 250V

Answer first: this page is a purchasing reference for the exact part number D3V-6G2-1C24-K from Omron Electronics Inc-EMC Div. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Omron Electronics Inc-EMC Div Part number: D3V-6G2-1C24-K Package: RFQ verification required

Key Parameters

Part NumberD3V-6G2-1C24-K
ManufacturerOmron Electronics Inc-EMC Div
CategoryLimit Switches
seriesD3V
packagingBulk
product statusObsolete
param 1SPDT
param 2On-Mom
param 36A (AC)
param 4250 V
param 5-
param 6Lever, Straight
param 7Chassis Mount
param 8Quick Connect - 0.187" (4.7mm)
param 9IP40
param 10-
param 1160gf
param 126.118gf
param 130.600" (15.2mm)
param 140.157" (4.0mm)
param 150.031" (0.8mm)
param 160.062" (1.6mm)
param 17-25°C ~ 105°C

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify D3V-6G2-1C24-K Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For D3V-6G2-1C24-K, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.