Home / Products / Application Specific Clock/Timing / onsemi / MC10H642FNR2G

onsemi MC10H642FNR2G

IC CLOCK DRIVER ECL-TTL 28-PLCC

Answer first: this page is a purchasing reference for the exact part number MC10H642FNR2G from onsemi. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: onsemi Category: Application Specific Clock/Timing Part number: MC10H642FNR2G Package: 28-LCC (J-Lead) RFQ verification required

Key Parameters

Part NumberMC10H642FNR2G
Manufactureronsemi
CategoryApplication Specific Clock/Timing
package28-LCC (J-Lead)
series-
packagingTape & Reel (TR)
product statusObsolete
param 1Not Verified
param 2No
param 368030, 68040 MPUs
param 4ECL, TTL
param 5TTL
param 61
param 72:8
param 8Yes/Yes
param 9100MHz
param 104.75V ~ 5.25V
param 110°C ~ 85°C
param 12Surface Mount
param 13-
param 14-
param 1528-PLCC (11.51x11.51)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify MC10H642FNR2G Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For MC10H642FNR2G, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.