Home / Products / FETs, MOSFETs / onsemi / NTLUS3A39PZCTBG

onsemi NTLUS3A39PZCTBG

MOSFET P-CH 20V 3.4A 6UDFN

Answer first: this page is a purchasing reference for the exact part number NTLUS3A39PZCTBG from onsemi. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: onsemi Category: FETs, MOSFETs Part number: NTLUS3A39PZCTBG Package: 6-PowerUFDFN RFQ verification required

Key Parameters

Part NumberNTLUS3A39PZCTBG
Manufactureronsemi
CategoryFETs, MOSFETs
package6-PowerUFDFN
seriesµCoolâ„¢
packagingTape & Reel (TR)
product statusObsolete
param 1P-Channel
param 2MOSFET (Metal Oxide)
param 320 V
param 43.4A (Ta)
param 51.5V, 4.5V
param 639mOhm @ 4A, 4.5V
param 71V @ 250µA
param 810.4 nC @ 4.5 V
param 9±8V
param 10920 pF @ 15 V
param 11-
param 12600mW (Ta)
param 13-55°C ~ 150°C (TJ)
param 14-
param 15-
param 16Surface Mount
param 176-UDFN (1.6x1.6)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify NTLUS3A39PZCTBG Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For NTLUS3A39PZCTBG, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.