onsemi SPS1M001A-04
RFID TAG R/W 902-928MHZ INLAY
Answer first: this page is a purchasing reference for the exact part number SPS1M001A-04 from onsemi. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | SPS1M001A-04 |
|---|---|
| Manufacturer | onsemi |
| Category | RFID Transponders, Tags |
| series | - |
| packaging | Tape & Reel (TR) |
| product status | Obsolete |
| param 1 | Inlay |
| param 2 | Passive |
| param 3 | 902MHz ~ 928MHz |
| param 4 | Read/Write |
| param 5 | 128b (EPC) |
| param 6 | ISO 18000-6, EPC |
| param 7 | -40°C ~ 85°C |
| param 8 | 6.469" L x 0.787" W (165.00mm x 20.00mm) |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify SPS1M001A-04 Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For SPS1M001A-04, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.