ORing Networking RGPS-92222GCP-NP-P
RACK-MOUNT 22X POE+ 10/100/1000T
Answer first: this page is a purchasing reference for the exact part number RGPS-92222GCP-NP-P from ORing Networking. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | RGPS-92222GCP-NP-P |
|---|---|
| Manufacturer | ORing Networking |
| Category | Switches, Hubs |
| series | RGPS |
| packaging | Box |
| product status | Active |
| param 1 | Switch - Managed |
| param 2 | Fixed + SFP |
| param 3 | 26 |
| param 4 | 24 |
| param 5 | 10/100 |
| param 6 | 2 |
| param 7 | SFP |
| param 8 | 2 |
| param 9 | SFP, Gigabit |
| param 10 | 24 |
| param 11 | RJ45, SFP |
| param 12 | 100 ~ 240VAC |
| param 13 | - |
| param 14 | Rack Mount |
| param 15 | -40°C ~ 60°C |
| param 16 | - |
| param 17 | - |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify RGPS-92222GCP-NP-P Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For RGPS-92222GCP-NP-P, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.