Home / Products / Power Distribution, Surge Protectors / Panduit Corp / P24F08M

Panduit Corp P24F08M

MPO PDU, 32AMP, 400V, (12)C13, (

Answer first: this page is a purchasing reference for the exact part number P24F08M from Panduit Corp. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Panduit Corp Category: Power Distribution, Surge Protectors Part number: P24F08M Package: RFQ verification required

Key Parameters

Part NumberP24F08M
ManufacturerPanduit Corp
CategoryPower Distribution, Surge Protectors
seriesSmartZoneā„¢
packagingBulk
product statusActive
param 1PDU (Power Distribution Unit)
param 2Rack, Vertical
param 332A
param 4International
param 5Circuit Breaker(s)
param 6IEC 60309 3P+N+E 6h
param 724
param 8IEC 320-C13 (12), C19 (12)
param 9415V
param 10Metal
param 11RJ45
param 12-
param 1310' (3.05m)
param 14CE, UKCA
param 15-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify P24F08M Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For P24F08M, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.