Home / Products / LED Indication - Discrete / QT Brightek (QTB) / QBLP631-AG

QT Brightek (QTB) QBLP631-AG

LED YLW-GRN CLEAR 0805 SMD

Answer first: this page is a purchasing reference for the exact part number QBLP631-AG from QT Brightek (QTB). Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: QT Brightek (QTB) Category: LED Indication - Discrete Part number: QBLP631-AG Package: 0805 (2012 Metric) RFQ verification required

Key Parameters

Part NumberQBLP631-AG
ManufacturerQT Brightek (QTB)
CategoryLED Indication - Discrete
package0805 (2012 Metric)
seriesQBLP631
packagingTape & Reel (TR)
product statusActive
param 1Yellow-Green
param 2Standard
param 3Colorless
param 4Clear
param 550mcd
param 6Rectangle with Flat Top
param 71.30mm x 1.25mm
param 82V
param 920mA
param 10140°
param 11Surface Mount
param 12570nm
param 13-
param 14-
param 15-
param 16-
param 170805
param 182.00mm L x 1.25mm W
param 190.90mm

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify QBLP631-AG Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For QBLP631-AG, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.