Home / Products / Renesas Electronics Corporation / RJK0851DPB-00#J5

Renesas Electronics Corporation RJK0851DPB-00#J5

MOSFET N-CH 80V 20A LFPAK

Answer first: this page is a purchasing reference for the exact part number RJK0851DPB-00#J5 from Renesas Electronics Corporation. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Renesas Electronics Corporation Part number: RJK0851DPB-00#J5 Package: SC-100, SOT-669 RFQ verification required

Key Parameters

Part NumberRJK0851DPB-00#J5
ManufacturerRenesas Electronics Corporation
CategoryFETs, MOSFETs
packageSC-100, SOT-669
series-
packagingTape & Reel (TR)
product statusActive
param 1N-Channel
param 2MOSFET (Metal Oxide)
param 380 V
param 420A (Ta)
param 54.5V, 10V
param 623mOhm @ 10A, 10V
param 72.5V @ 1mA
param 814 nC @ 4.5 V
param 9±20V
param 102050 pF @ 10 V
param 11-
param 1245W (Tc)
param 13150°C (TJ)
param 14-
param 15-
param 16Surface Mount
param 17LFPAK

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify RJK0851DPB-00#J5 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For RJK0851DPB-00#J5, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.