Home / Products / FETs, MOSFETs / Rohm Semiconductor / SCT3120ALHRC11

Rohm Semiconductor SCT3120ALHRC11

SICFET N-CH 650V 21A TO247N

Answer first: this page is a purchasing reference for the exact part number SCT3120ALHRC11 from Rohm Semiconductor. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Rohm Semiconductor Category: FETs, MOSFETs Part number: SCT3120ALHRC11 Package: TO-247-3 RFQ verification required

Key Parameters

Part NumberSCT3120ALHRC11
ManufacturerRohm Semiconductor
CategoryFETs, MOSFETs
packageTO-247-3
series-
packagingTube
product statusActive
param 1N-Channel
param 2SiCFET (Silicon Carbide)
param 3650 V
param 421A (Tc)
param 518V
param 6156mOhm @ 6.7A, 18V
param 75.6V @ 3.33mA
param 838 nC @ 18 V
param 9+22V, -4V
param 10460 pF @ 500 V
param 11-
param 12103W
param 13175°C (TJ)
param 14Automotive
param 15AEC-Q101
param 16Through Hole
param 17TO-247N

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify SCT3120ALHRC11 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For SCT3120ALHRC11, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.