Home / Products / Rohm Semiconductor / SMLP34RGBN1W3

Rohm Semiconductor SMLP34RGBN1W3

LED RGB 0404 SMD

Answer first: this page is a purchasing reference for the exact part number SMLP34RGBN1W3 from Rohm Semiconductor. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Rohm Semiconductor Part number: SMLP34RGBN1W3 Package: 0404 (1010 Metric) RFQ verification required

Key Parameters

Part NumberSMLP34RGBN1W3
ManufacturerRohm Semiconductor
CategoryLED Indication - Discrete
package0404 (1010 Metric)
series-
packagingTape & Reel (TR)
product statusActive
param 1Red, Green, Blue (RGB)
param 2Common Anode
param 3-
param 4-
param 580mcd Red, 220mcd Green, 60mcd Blue
param 6Rectangle with Flat Top
param 71.00mm
param 81.9V Red, 2.9V Green, 3V Blue
param 95mA Red, 5mA Green, 5mA Blue
param 10-
param 11Surface Mount
param 12624nm Red, 527nm Green, 470nm Blue
param 13-
param 14-
param 15-
param 16-
param 170404
param 181.00mm L x 1.00mm W
param 190.25mm

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify SMLP34RGBN1W3 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For SMLP34RGBN1W3, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.