Home / Products / LED COBs, Engines, Modules, Strips / Samsung Semiconductor, Inc. / SPHWHAHDNF27YZV3D1

Samsung Semiconductor, Inc. SPHWHAHDNF27YZV3D1

LED COB LC019D WM WHT SQ 3000K

Answer first: this page is a purchasing reference for the exact part number SPHWHAHDNF27YZV3D1 from Samsung Semiconductor, Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Samsung Semiconductor, Inc. Category: LED COBs, Engines, Modules, Strips Part number: SPHWHAHDNF27YZV3D1 Package: RFQ verification required

Key Parameters

Part NumberSPHWHAHDNF27YZV3D1
ManufacturerSamsung Semiconductor, Inc.
CategoryLED COBs, Engines, Modules, Strips
seriesLC019D
packagingTray
product statusObsolete
param 1Chip On Board (COB)
param 2White, Warm
param 33000K 3-Step MacAdam Ellipse
param 4-
param 5Square
param 62262lm (2207lm ~ 2317lm)
param 7540mA
param 885°C
param 934.6V
param 10121 lm/W
param 11970mA
param 1290
param 13115°
param 14-
param 1519.00mm L x 19.00mm W
param 161.50mm
param 1717.00mm Dia
param 18Domed

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify SPHWHAHDNF27YZV3D1 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For SPHWHAHDNF27YZV3D1, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.