Home / Products / LED White Lighting / Samsung Semiconductor, Inc. / SPMWH3326MD3WAW3SA

Samsung Semiconductor, Inc. SPMWH3326MD3WAW3SA

LED LM301Z WARM WHT 3000K 3030

Answer first: this page is a purchasing reference for the exact part number SPMWH3326MD3WAW3SA from Samsung Semiconductor, Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Samsung Semiconductor, Inc. Category: LED White Lighting Part number: SPMWH3326MD3WAW3SA Package: 1212 (3030 Metric) RFQ verification required

Key Parameters

Part NumberSPMWH3326MD3WAW3SA
ManufacturerSamsung Semiconductor, Inc.
CategoryLED White Lighting
package1212 (3030 Metric)
seriesLM301Z
packagingTape & Reel (TR)
product statusObsolete
param 1White, Warm
param 23000K 3-Step MacAdam Ellipse
param 3-
param 432lm (30lm ~ 33lm)
param 565mA
param 62.75V
param 7179 lm/W
param 870
param 9400mA
param 10120°
param 11-
param 12-
param 13Surface Mount
param 143030
param 150.118" L x 0.118" W (3.00mm x 3.00mm)
param 160.024" (0.60mm)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify SPMWH3326MD3WAW3SA Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For SPMWH3326MD3WAW3SA, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.