Home / Products / DC Brushless Fans (BLDC) / Sanyo Denki America Inc. / 109R0624G4J01

Sanyo Denki America Inc. 109R0624G4J01

3CYG3

Answer first: this page is a purchasing reference for the exact part number 109R0624G4J01 from Sanyo Denki America Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Sanyo Denki America Inc. Category: DC Brushless Fans (BLDC) Part number: 109R0624G4J01 Package: RFQ verification required

Key Parameters

Part Number109R0624G4J01
ManufacturerSanyo Denki America Inc.
CategoryDC Brushless Fans (BLDC)
seriesSan Ace 60
packagingBox
product statusActive
param 124VDC
param 2Square - 60mm L x 60mm H
param 325.00mm
param 4-
param 5-
param 6Vapo-Bearing™
param 7Tubeaxial
param 8Speed Sensor (Tach)
param 939.0dB(A)
param 10-
param 115600 RPM
param 123 Wire Leads
param 13-
param 1414 ~ 158°F (-10 ~ 70°C)
param 15-
param 16-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify 109R0624G4J01 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For 109R0624G4J01, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.