Home / Products / Common Mode Chokes / Schaffner EMC Inc. / RN222-1-02-18M

Schaffner EMC Inc. RN222-1-02-18M

CMC 18MH 1A 2LN TH

Answer first: this page is a purchasing reference for the exact part number RN222-1-02-18M from Schaffner EMC Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Schaffner EMC Inc. Category: Common Mode Chokes Part number: RN222-1-02-18M Package: Vertical, 4 PC Pin RFQ verification required

Key Parameters

Part NumberRN222-1-02-18M
ManufacturerSchaffner EMC Inc.
CategoryCommon Mode Chokes
packageVertical, 4 PC Pin
seriesRN
packagingTube
product statusActive
param 1Power Line
param 22
param 3-
param 418 mH @ 10 kHz
param 51A
param 6630mOhm (Typ)
param 7-
param 8300V
param 9-40°C ~ 100°C
param 10-
param 11ENEC, UR, VDE
param 12-
param 13-
param 14-
param 15Through Hole
param 161.220" L x 0.709" W (31.00mm x 18.00mm)
param 171.165" (29.60mm)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify RN222-1-02-18M Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For RN222-1-02-18M, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.