Home / Products / Power Relays, Over 2 Amps / Schneider Electric / RPM41B7

Schneider Electric RPM41B7

HARMONY, POWER PLUG-IN RELAY, 15

Answer first: this page is a purchasing reference for the exact part number RPM41B7 from Schneider Electric. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Schneider Electric Category: Power Relays, Over 2 Amps Part number: RPM41B7 Package: RFQ verification required

Key Parameters

Part NumberRPM41B7
ManufacturerSchneider Electric
CategoryPower Relays, Over 2 Amps
seriesHarmony
packagingBox
product statusObsolete
param 1Socketable
param 224VAC
param 34PDT (4 Form C)
param 415 A
param 5250VAC, 28VDC - Max
param 63750VA, 420W
param 7300 mA
param 8Non Latching
param 9Test Button
param 10Plug In
param 11-
param 12-
param 1319.2 VAC
param 143.6 VAC
param 1520 ms
param 1620 ms
param 17-40°C ~ 55°C
param 18Silver Nickel (AgNi)
param 19CSA, EAC, UL
param 20General Purpose
param 21-
param 22-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify RPM41B7 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For RPM41B7, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.