SCHURTER Inc. 3-135-296
PWR ENT RCPT PANEL QC
Answer first: this page is a purchasing reference for the exact part number 3-135-296 from SCHURTER Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | 3-135-296 |
|---|---|
| Manufacturer | SCHURTER Inc. |
| Category | Power Entry Modules (PEM) |
| series | 4750 |
| packaging | Box |
| product status | Active |
| param 1 | - |
| param 2 | Receptacle, Female Sockets |
| param 3 | - |
| param 4 | - |
| param 5 | 3 per connection (7) |
| param 6 | Unfiltered - Commercial |
| param 7 | - |
| param 8 | - |
| param 9 | - |
| param 10 | No |
| param 11 | Panel Mount, Snap-In |
| param 12 | Quick Connect - 0.189" (4.8mm) |
| param 13 | Light Pipe |
| param 14 | - |
| param 15 | Rectangular - 32.50mm x 168.40mm |
| param 16 | 0.059" (1.50mm) |
| param 17 | UL94 V-0 |
| param 18 | IP20 |
| param 19 | CCC, cULus, VDE |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify 3-135-296 Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For 3-135-296, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.