Home / Products / SCHURTER Inc. / CDL4.4101.151

SCHURTER Inc. CDL4.4101.151

PWR ENT MOD RCPT IEC320-C14 PNL

Answer first: this page is a purchasing reference for the exact part number CDL4.4101.151 from SCHURTER Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: SCHURTER Inc. Part number: CDL4.4101.151 Package: RFQ verification required

Key Parameters

Part NumberCDL4.4101.151
ManufacturerSCHURTER Inc.
CategoryPower Entry Modules (PEM)
seriesCD
packagingBulk
product statusActive
param 1IEC 320-C14
param 2Receptacle, Male Blades - Module
param 310A
param 4250VAC
param 53
param 6Filtered (EMI, RFI) - Commercial, Medical
param 710A
param 8Switch On-Off
param 9-
param 10Yes (Fuse Not Included)
param 11Panel Mount, Flange
param 12Quick Connect - 0.189" (4.8mm)
param 13Voltage Selector
param 14Fuse Holder
param 15Rectangular - 28.50mm x 67.50mm
param 16-
param 17UL94 V-0
param 18IP40
param 19cULus, ENEC

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify CDL4.4101.151 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For CDL4.4101.151, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.