Home / Products / Power Entry Modules (PEM) / SCHURTER Inc. / GSP4.0210.13

SCHURTER Inc. GSP4.0210.13

GSP4 CONNECTOR INLET 16A C24

Answer first: this page is a purchasing reference for the exact part number GSP4.0210.13 from SCHURTER Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: SCHURTER Inc. Category: Power Entry Modules (PEM) Part number: GSP4.0210.13 Package: RFQ verification required

Key Parameters

Part NumberGSP4.0210.13
ManufacturerSCHURTER Inc.
CategoryPower Entry Modules (PEM)
seriesGSP4
packagingBox
product statusLast Time Buy
param 1IEC 320-C24
param 2Receptacle, Male Blades
param 316A
param 4250VAC
param 53
param 6Unfiltered - Commercial
param 7-
param 8-
param 9-
param 10No
param 11Panel Mount, Snap-In; Through Hole, Right Angle
param 12Solder
param 13V-Lock Notch
param 14-
param 15Rectangular - 32.40mm x 24.40mm
param 160.059" (1.50mm)
param 17UL94 V-0
param 18IP20
param 19CCC, cULus, ENEC

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify GSP4.0210.13 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For GSP4.0210.13, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.