ScioSense GP30YA-F01_ST_NS V1.0
GPX2-EVA-BOARD V1.1
Answer first: this page is a purchasing reference for the exact part number GP30YA-F01_ST_NS V1.0 from ScioSense. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | GP30YA-F01_ST_NS V1.0 |
|---|---|
| Manufacturer | ScioSense |
| Category | Expansion Boards, Daughter Cards |
| series | - |
| packaging | Bulk |
| product status | Active |
| param 1 | Nucleo |
| param 2 | Sensor |
| param 3 | Light, 3D Time-of-Flight (ToF) |
| param 4 | TDC-GP30YA-F01 |
| param 5 | Board(s) |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify GP30YA-F01_ST_NS V1.0 Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For GP30YA-F01_ST_NS V1.0, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.