Home / Products / Souriau-Sunbank by Eaton / D38999/20WJ43AE

Souriau-Sunbank by Eaton D38999/20WJ43AE

D38999/20WJ43AE

Answer first: this page is a purchasing reference for the exact part number D38999/20WJ43AE from Souriau-Sunbank by Eaton. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Souriau-Sunbank by Eaton Part number: D38999/20WJ43AE Package: RFQ verification required

Key Parameters

Part NumberD38999/20WJ43AE
ManufacturerSouriau-Sunbank by Eaton
CategoryCircular Connector Housings
seriesDTS
packagingBag
product statusActive
param 1Receptacle Housing
param 2For Female Sockets
param 343
param 4Military
param 5MIL-DTL-38999 Series III
param 625-43
param 7J
param 8Crimp
param 916 (20), 20 (23)
param 10Panel Mount
param 11Flange
param 12Threaded
param 13E
param 14Metal
param 15Aluminum Alloy
param 16Chromate over Cadmium
param 17Olive Drab
param 18-
param 19-
param 20-
param 21-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify D38999/20WJ43AE Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For D38999/20WJ43AE, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.