Home / Products / Uninterruptible Power Supply (UPS) Systems / Staco Energy Products Company / SCV-30002

Staco Energy Products Company SCV-30002

STACO UNISTAR V UNIVERSAL MOUNT

Answer first: this page is a purchasing reference for the exact part number SCV-30002 from Staco Energy Products Company. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Staco Energy Products Company Category: Uninterruptible Power Supply (UPS) Systems Part number: SCV-30002 Package: RFQ verification required

Key Parameters

Part NumberSCV-30002
ManufacturerStaco Energy Products Company
CategoryUninterruptible Power Supply (UPS) Systems
seriesUniStar® VP
packagingBulk
product statusObsolete
param 1Online (Double Conversion)
param 2-
param 3Network, Single Phase
param 4Rackmount, Tower
param 53kVA / 2700W
param 66 (UPS)
param 72.7 minutes
param 8-
param 9200V, 208V, 220V, 230V, 240V
param 10IEC 320-C20
param 11IEC 60320-C13
param 12-
param 13-
param 1425.098" L x 17.244" W (637.50mm x 438.00mm)
param 153.394" (86.20mm)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify SCV-30002 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For SCV-30002, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.