Home / Products / Circular Cable Assemblies / Stewart Connector / BM-MAMM030F

Stewart Connector BM-MAMM030F

CIRC CBL 8POS RCPT TO RCPT 3'

Answer first: this page is a purchasing reference for the exact part number BM-MAMM030F from Stewart Connector. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Stewart Connector Category: Circular Cable Assemblies Part number: BM-MAMM030F Package: RFQ verification required

Key Parameters

Part NumberBM-MAMM030F
ManufacturerStewart Connector
CategoryCircular Cable Assemblies
series-
packagingBag
product statusActive
param 1Receptacle
param 2Male Pins
param 38
param 4All
param 5M12
param 6X
param 7Free Hanging (In-Line)
param 8Receptacle
param 9Male Pins
param 108
param 11All
param 12M12
param 13X
param 14Free Hanging (In-Line)
param 1530.0' (9.14m)
param 16Standard
param 17Round
param 18Thermoplastic Elastomer (TPE)
param 19Teal
param 20Shielded
param 21-
param 22Cat6a

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify BM-MAMM030F Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For BM-MAMM030F, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.