Home / Products / SunLED / XZM2CRKM2DGFBB45SCCB

SunLED XZM2CRKM2DGFBB45SCCB

LED RGB CLEAR 4PLCC SMD

Answer first: this page is a purchasing reference for the exact part number XZM2CRKM2DGFBB45SCCB from SunLED. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: SunLED Part number: XZM2CRKM2DGFBB45SCCB Package: 4-PLCC RFQ verification required

Key Parameters

Part NumberXZM2CRKM2DGFBB45SCCB
ManufacturerSunLED
CategoryLED Indication - Discrete
package4-PLCC
series-
packagingTape & Reel (TR)
product statusActive
param 1Red, Green, Blue (RGB)
param 2Common Cathode
param 3Colorless
param 4Clear
param 5497mcd Red, 1590mcd Green, 327mcd Blue
param 6Round with Flat Top
param 72.40mm Dia
param 82.2V Red, 3.2V Green, 3.3V Blue
param 920mA Red, 20mA Green, 20mA Blue
param 10120°
param 11Surface Mount
param 12625nm Red, 525nm Green, 470nm Blue
param 13640nm Red, 520nm Green, 465nm Blue
param 14-
param 15-
param 16-
param 174-PLCC
param 183.20mm L x 2.80mm W
param 192.10mm

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify XZM2CRKM2DGFBB45SCCB Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For XZM2CRKM2DGFBB45SCCB, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.