Home / Products / Multiple Conductor Cables / Syston / DK-8003-SB-WH-50

Syston DK-8003-SB-WH-50

16/2 CMP CL3P LED Lighting Wire

Answer first: this page is a purchasing reference for the exact part number DK-8003-SB-WH-50 from Syston. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Syston Category: Multiple Conductor Cables Part number: DK-8003-SB-WH-50 Package: RFQ verification required

Key Parameters

Part NumberDK-8003-SB-WH-50
ManufacturerSyston
CategoryMultiple Conductor Cables
series8003
packagingBulk
product statusActive
param 1Multi-Conductor
param 22 (1 Pair)
param 316 AWG
param 4-
param 5Copper
param 6Poly-Vinyl Chloride (PVC), Plenum
param 70.177" (4.50mm)
param 8-
param 950.00' (15.24m)
param 10White
param 11UL Style CMP
param 12Flame Retardant, Low Smoke
param 13300 V
param 14-35°C ~ 75°C
param 15Audio, Control, Data, Dimming, Fire Systems, Power, Security
param 16-
param 17Poly-Vinyl Chloride (PVC)
param 18-
param 19-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify DK-8003-SB-WH-50 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For DK-8003-SB-WH-50, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.