Home / Products / Common Mode Chokes / TDK Corporation / TCM2010-261-4P-T

TDK Corporation TCM2010-261-4P-T

CMC 40MA 4LN 260 OHM SMD

Answer first: this page is a purchasing reference for the exact part number TCM2010-261-4P-T from TDK Corporation. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: TDK Corporation Category: Common Mode Chokes Part number: TCM2010-261-4P-T Package: 0804 (2010 Metric), 8 Lead RFQ verification required

Key Parameters

Part NumberTCM2010-261-4P-T
ManufacturerTDK Corporation
CategoryCommon Mode Chokes
package0804 (2010 Metric), 8 Lead
seriesTCM
packagingTape & Reel (TR)
product statusObsolete
param 1Signal Line
param 24
param 3260 Ohms @ 100 MHz
param 4-
param 540mA
param 65Ohm
param 710V
param 8-
param 9-25°C ~ 85°C
param 10-
param 11-
param 12-
param 13-
param 14-
param 15Surface Mount
param 160.079" L x 0.039" W (2.00mm x 1.00mm)
param 170.035" (0.90mm)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify TCM2010-261-4P-T Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For TCM2010-261-4P-T, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.