Home / Products / TE Connectivity Aerospace, Defense and Marine / 5-208870-1

TE Connectivity Aerospace, Defense and Marine 5-208870-1

CONN D-SUB HD PLUG 78P VERT SLDR

Answer first: this page is a purchasing reference for the exact part number 5-208870-1 from TE Connectivity Aerospace, Defense and Marine. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: TE Connectivity Aerospace, Defense and Marine Part number: 5-208870-1 Package: RFQ verification required

Key Parameters

Part Number5-208870-1
ManufacturerTE Connectivity Aerospace, Defense and Marine
CategoryD-Sub Connector Assemblies
seriesAMPLIMITE 90
packagingBulk
product statusActive
param 1D-Sub, High Density
param 2Plug, Male Pins
param 378
param 44
param 5Through Hole
param 65 (DD, D) High Density
param 7Signal
param 8Housing/Shell (Unthreaded)
param 9Solder
param 10-
param 11Steel, Yellow Chromate Plated Zinc
param 12Gold
param 13-
param 14-
param 15-
param 165A
param 17-
param 18-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify 5-208870-1 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For 5-208870-1, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.