Home / Products / Coaxial Connector (RF) Adapters / TE Connectivity Linx / ADP-SMAM-MCXF

TE Connectivity Linx ADP-SMAM-MCXF

SMA PLUG TO MCX JACK ADAPTER

Answer first: this page is a purchasing reference for the exact part number ADP-SMAM-MCXF from TE Connectivity Linx. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: TE Connectivity Linx Category: Coaxial Connector (RF) Adapters Part number: ADP-SMAM-MCXF Package: RFQ verification required

Key Parameters

Part NumberADP-SMAM-MCXF
ManufacturerTE Connectivity Linx
CategoryCoaxial Connector (RF) Adapters
series-
packagingBulk
product statusActive
param 1Plug to Jack
param 2Between Series
param 3SMA to MCX
param 4Male to Female
param 5SMA Plug, Male Pin
param 6MCX Jack, Female Socket
param 750 Ohms
param 8Straight
param 9Free Hanging (In-Line)
param 10-
param 11Snap-On, Threaded
param 126 GHz
param 13-
param 14Gold
param 15-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify ADP-SMAM-MCXF Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For ADP-SMAM-MCXF, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.