Home / Products / Heat Shrink Tubing / TE Connectivity Raychem Cable Protection / RNF-3000-1.5/0.5-X-SP

TE Connectivity Raychem Cable Protection RNF-3000-1.5/0.5-X-SP

HEAT SHRINK TUBING 1=1M

Answer first: this page is a purchasing reference for the exact part number RNF-3000-1.5/0.5-X-SP from TE Connectivity Raychem Cable Protection. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: TE Connectivity Raychem Cable Protection Category: Heat Shrink Tubing Part number: RNF-3000-1.5/0.5-X-SP Package: RFQ verification required

Key Parameters

Part NumberRNF-3000-1.5/0.5-X-SP
ManufacturerTE Connectivity Raychem Cable Protection
CategoryHeat Shrink Tubing
seriesThermofit RNF-3000
packagingBulk
product statusDiscontinued at Digi-Key
param 1Tubing, Flexible
param 23 to 1
param 33.28' (1.00m)
param 40.059" (1.50mm)
param 50.018" (0.45mm)
param 60.018" (0.46mm)
param 7Polyolefin (PO)
param 8-
param 9Clear
param 10-55°C ~ 135°C
param 11-
param 12-
param 1380°C
param 14-
param 15144 Months

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify RNF-3000-1.5/0.5-X-SP Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For RNF-3000-1.5/0.5-X-SP, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.