Home / Products / Single FETs, MOSFETs / Toshiba Semiconductor and Storage / 3SK291(TE85L,F)

Toshiba Semiconductor and Storage 3SK291(TE85L,F)

RF MOSFET 6V SMQ

Answer first: this page is a purchasing reference for the exact part number 3SK291(TE85L,F) from Toshiba Semiconductor and Storage. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Toshiba Semiconductor and Storage Category: Single FETs, MOSFETs Part number: 3SK291(TE85L,F) Package: SC-61AA RFQ verification required

Key Parameters

Part Number3SK291(TE85L,F)
ManufacturerToshiba Semiconductor and Storage
CategorySingle FETs, MOSFETs
packageSC-61AA
series-
packagingTape & Reel (TR)
product statusObsolete
param 1MOSFET (Metal Oxide)
param 2N-Channel Dual Gate
param 3800MHz
param 422.5dB
param 56 V
param 630mA
param 72.5dB
param 810 mA
param 9-
param 1012.5 V
param 11-
param 12-
param 13Surface Mount
param 14SMQ

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify 3SK291(TE85L,F) Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For 3SK291(TE85L,F), SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.