Home / Products / Triac, SCR Output Optoisolators / Toshiba Semiconductor and Storage / TLP267J(E

Toshiba Semiconductor and Storage TLP267J(E

X36 PB-F TRIAC COUPLER LOW TRIGG

Answer first: this page is a purchasing reference for the exact part number TLP267J(E from Toshiba Semiconductor and Storage. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Toshiba Semiconductor and Storage Category: Triac, SCR Output Optoisolators Part number: TLP267J(E Package: 6-SOIC (0.173", 4.40mm Width), 4 Leads RFQ verification required

Key Parameters

Part NumberTLP267J(E
ManufacturerToshiba Semiconductor and Storage
CategoryTriac, SCR Output Optoisolators
package6-SOIC (0.173", 4.40mm Width), 4 Leads
series-
packagingTube
product statusActive
param 1Triac
param 2No
param 31
param 43750Vrms
param 5600 V
param 6500V/µs (Typ)
param 73mA
param 870 mA
param 9200µA (Typ)
param 10100µs
param 111.27V
param 1230 mA
param 13-40°C ~ 100°C
param 14Surface Mount
param 156-SOP
param 16CQC, cUR, UR

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify TLP267J(E Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For TLP267J(E, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.