Home / Products / Uninterruptible Power Supply (UPS) Systems / Tripp Lite / 5P1000

Tripp Lite 5P1000

MOTORS & SOLENIODS

Answer first: this page is a purchasing reference for the exact part number 5P1000 from Tripp Lite. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Tripp Lite Category: Uninterruptible Power Supply (UPS) Systems Part number: 5P1000 Package: RFQ verification required

Key Parameters

Part Number5P1000
ManufacturerTripp Lite
CategoryUninterruptible Power Supply (UPS) Systems
series-
packagingBulk
product statusActive
param 1Line Interactive (Input Regulation)
param 2100VAC, 110VAC, 120VAC, 127VAC
param 3Network, Single Phase
param 4Tower
param 51kVA / 385W
param 68 (UPS)
param 75 minutes
param 8-
param 9100V, 120V, 125V
param 10NEMA 5-15P
param 11NEMA 5-15R (8)
param 125.9' (1.80m)
param 13CE, cUL, FCC, UL
param 1413.600" L x 5.900" W (345.44mm x 149.86mm)
param 159.100" (231.14mm)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify 5P1000 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For 5P1000, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.