Home / Products / Uninterruptible Power Supply (UPS) Systems / Tripp Lite / 5SC2200IRT

Tripp Lite 5SC2200IRT

MOTORS & SOLENIODS

Answer first: this page is a purchasing reference for the exact part number 5SC2200IRT from Tripp Lite. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Tripp Lite Category: Uninterruptible Power Supply (UPS) Systems Part number: 5SC2200IRT Package: RFQ verification required

Key Parameters

Part Number5SC2200IRT
ManufacturerTripp Lite
CategoryUninterruptible Power Supply (UPS) Systems
series5SC
packagingBulk
product statusActive
param 1Line Interactive (Input Regulation)
param 2184V ~ 276V
param 3General Purpose, Industrial Control
param 4Rackmount, Tower
param 52.2kVA / 1980W
param 69
param 714 minutes
param 8RS-232
param 9230V
param 10IEC 320-C13
param 11C13 (8), C19 (1)
param 12-
param 13CB, CE, cTUVus
param 1415.945" L x 17.323" W (405.00mm x 440.00mm)
param 153.394" (86.20mm)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify 5SC2200IRT Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For 5SC2200IRT, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.