Home / Products / Uninterruptible Power Supply (UPS) Systems / Tripp Lite / 9PXM12BBFHJ

Tripp Lite 9PXM12BBFHJ

MOTORS & SOLENIODS

Answer first: this page is a purchasing reference for the exact part number 9PXM12BBFHJ from Tripp Lite. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Tripp Lite Category: Uninterruptible Power Supply (UPS) Systems Part number: 9PXM12BBFHJ Package: RFQ verification required

Key Parameters

Part Number9PXM12BBFHJ
ManufacturerTripp Lite
CategoryUninterruptible Power Supply (UPS) Systems
series9PXM
packagingBulk
product statusActive
param 1-
param 2110/220VAC, 120/208VAC, 120/240VAC, 127/220VAC
param 3General Purpose, Industrial Control
param 4Tower
param 58kVA
param 614
param 7-
param 8-
param 9-
param 10Hardwired
param 11NEMA 5-20R (8),NEMA L6-20R (2), NEMA L6-30R (2), NEMA L14-30R (2)
param 12-
param 13CE, cTUVus, cUL, FCC, NOM, UL
param 1434.100" L x 17.500" W (866.14mm x 444.50mm)
param 1536.500" (927.10mm)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify 9PXM12BBFHJ Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For 9PXM12BBFHJ, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.