Home / Products / Power Distribution, Surge Protectors / Tripp Lite / PDU3XEVSR6G30B

Tripp Lite PDU3XEVSR6G30B

17.3KW 3-PHASE SWITCHED PDU, LX

Answer first: this page is a purchasing reference for the exact part number PDU3XEVSR6G30B from Tripp Lite. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Tripp Lite Category: Power Distribution, Surge Protectors Part number: PDU3XEVSR6G30B Package: RFQ verification required

Key Parameters

Part NumberPDU3XEVSR6G30B
ManufacturerTripp Lite
CategoryPower Distribution, Surge Protectors
series-
packagingBulk
product statusActive
param 1PDU (Power Distribution Unit)
param 2Rack, Vertical
param 324A
param 4International
param 5None
param 6IEC-309
param 730
param 8C13 (24), C19 (6)
param 9415V
param 10Metal
param 11-
param 12-
param 136' (1.83m)
param 14CSA, FCC, IEC, NOM, UL
param 15-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify PDU3XEVSR6G30B Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For PDU3XEVSR6G30B, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.