Home / Products / Tripp Lite / S3M15K3B

Tripp Lite S3M15K3B

3-PHASE 208/220/120/127V 15KVA/K

Answer first: this page is a purchasing reference for the exact part number S3M15K3B from Tripp Lite. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Tripp Lite Part number: S3M15K3B Package: RFQ verification required

Key Parameters

Part NumberS3M15K3B
ManufacturerTripp Lite
CategoryUninterruptible Power Supply (UPS) Systems
seriesSmartOnline®
packagingBulk
product statusObsolete
param 1Online (Double Conversion)
param 2120V, 208V (3-Phase), 127V, 220V (3-Phase)
param 3Network, 3-Phase
param 4Tower
param 515kVA / 15kW
param 6-
param 713 minutes
param 8RS-232
param 9120V, 208V (3-Phase), 127V, 220V (3-Phase)
param 10Hardwired
param 11-
param 12-
param 13CSA, FCC, UL
param 1435.430" L x 9.840" W (899.92mm x 249.94mm)
param 1534.170" (867.92mm)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify S3M15K3B Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For S3M15K3B, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.