UJU PF050-O51B-C20-C
[EROS] FFC 0.5PITCH 51PIN H=2.2M
Answer first: this page is a purchasing reference for the exact part number PF050-O51B-C20-C from UJU. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | PF050-O51B-C20-C |
|---|---|
| Manufacturer | UJU |
| Category | FFC, FPC (Flat Flexible) Connector Assemblies |
| series | EROS |
| packaging | Strip |
| product status | Active |
| param 1 | - |
| param 2 | - |
| param 3 | - |
| param 4 | 51 |
| param 5 | 0.020" (0.50mm) |
| param 6 | - |
| param 7 | - |
| param 8 | 0.087" (2.20mm) |
| param 9 | Flip Lock |
| param 10 | - |
| param 11 | - |
| param 12 | - |
| param 13 | - |
| param 14 | - |
| param 15 | - |
| param 16 | - |
| param 17 | - |
| param 18 | - |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify PF050-O51B-C20-C Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For PF050-O51B-C20-C, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.