Home / Products / AC DC Converters / Vicor Corporation / VI-ARMB-M22

Vicor Corporation VI-ARMB-M22

AC/DC CONVERTER 200-375V

Answer first: this page is a purchasing reference for the exact part number VI-ARMB-M22 from Vicor Corporation. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Vicor Corporation Category: AC DC Converters Part number: VI-ARMB-M22 Package: Quarter Brick RFQ verification required

Key Parameters

Part NumberVI-ARMB-M22
ManufacturerVicor Corporation
CategoryAC DC Converters
packageQuarter Brick
series-
packagingBox
product statusActive
param 1Enclosed
param 21
param 390 ~ 264 VAC
param 4200 ~ 375V
param 5-
param 6-
param 7-
param 8-
param 9-
param 10ITE (Commercial)
param 11Baseplate, PFC, Remote On/Off, Universal Input
param 12-55°C ~ 100°C
param 1398%
param 14Through Hole
param 152.28" L x 1.45" W x 0.62" H (57.9mm x 36.8mm x 15.7mm)
param 16CE, cTUVus
param 1760950-1

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify VI-ARMB-M22 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For VI-ARMB-M22, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.