Home / Products / Tantalum - Polymer Capacitors / Vishay Sprague / T59EE226M075E0100

Vishay Sprague T59EE226M075E0100

T59226M075EE8T0100

Answer first: this page is a purchasing reference for the exact part number T59EE226M075E0100 from Vishay Sprague. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Vishay Sprague Category: Tantalum - Polymer Capacitors Part number: T59EE226M075E0100 Package: 2917 (7343 Metric) RFQ verification required

Key Parameters

Part NumberT59EE226M075E0100
ManufacturerVishay Sprague
CategoryTantalum - Polymer Capacitors
package2917 (7343 Metric)
seriesvPolyTan™ T59
packagingTape & Reel (TR)
product statusActive
param 122 µF
param 2±20%
param 375 V
param 4Molded
param 5100mOhm @ 100kHz
param 6-55°C ~ 125°C
param 72000 Hrs @ 105°C
param 8Surface Mount
param 90.287" L x 0.169" W (7.30mm x 4.30mm)
param 100.169" (4.30mm)
param 11-
param 12EE
param 13-
param 14General Purpose

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify T59EE226M075E0100 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For T59EE226M075E0100, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.