Home / Products / Tantalum Capacitors / Vishay Sprague / TH3D156M020D0900

Vishay Sprague TH3D156M020D0900

CAP TANT 15UF 20% 20V 2917

Answer first: this page is a purchasing reference for the exact part number TH3D156M020D0900 from Vishay Sprague. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Vishay Sprague Category: Tantalum Capacitors Part number: TH3D156M020D0900 Package: 2917 (7343 Metric) RFQ verification required

Key Parameters

Part NumberTH3D156M020D0900
ManufacturerVishay Sprague
CategoryTantalum Capacitors
package2917 (7343 Metric)
seriesTANTAMOUNTâ„¢, TH3
packagingTape & Reel (TR)
product statusActive
param 115 µF
param 2±20%
param 320 V
param 4Molded
param 5900mOhm
param 6-55°C ~ 150°C
param 7-
param 8Surface Mount
param 90.287" L x 0.169" W (7.30mm x 4.30mm)
param 100.122" (3.10mm)
param 11-
param 12D
param 13AEC-Q200
param 14Automotive
param 15-
param 16Automotive
param 17AEC-Q200

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify TH3D156M020D0900 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For TH3D156M020D0900, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.