Home / Products / Vishay Beyschlag/Draloric/BC Components / MALSECL00AG310HARK

Vishay Beyschlag/Draloric/BC Components MALSECL00AG310HARK

CAP ALUM 100UF 20% 50V SMD

Answer first: this page is a purchasing reference for the exact part number MALSECL00AG310HARK from Vishay Beyschlag/Draloric/BC Components. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Vishay Beyschlag/Draloric/BC Components Part number: MALSECL00AG310HARK Package: RFQ verification required

Key Parameters

Part NumberMALSECL00AG310HARK
ManufacturerVishay Beyschlag/Draloric/BC Components
CategoryAluminum Electrolytic Capacitors
seriesECL
packagingBulk
product statusObsolete
param 1100 µF
param 2±20%
param 350 V
param 4180mOhm @ 100kHz
param 52000 Hrs @ 105°C
param 6-40°C ~ 105°C
param 7Polar
param 8-
param 9General Purpose
param 10395.3 mA @ 120 Hz
param 11-
param 12-
param 13-
param 140.394" Dia (10.00mm)
param 150.413" (10.50mm)
param 160.406" L x 0.406" W (10.30mm x 10.30mm)
param 17Surface Mount
param 18Radial, Can - SMD

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify MALSECL00AG310HARK Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For MALSECL00AG310HARK, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.