Home / Products / LED Indication - Discrete / Vishay Semiconductor Opto Division / VLMTG1501

Vishay Semiconductor Opto Division VLMTG1501

LED GREEN 0402 SMD

Answer first: this page is a purchasing reference for the exact part number VLMTG1501 from Vishay Semiconductor Opto Division. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Vishay Semiconductor Opto Division Category: LED Indication - Discrete Part number: VLMTG1501 Package: 0402 (1005 Metric) RFQ verification required

Key Parameters

Part NumberVLMTG1501
ManufacturerVishay Semiconductor Opto Division
CategoryLED Indication - Discrete
package0402 (1005 Metric)
series-
packagingTape & Reel (TR)
product statusActive
param 1Green
param 2-
param 3-
param 4-
param 5118mcd
param 6Rectangle with Flat Top
param 71.00mm x 0.50mm
param 82.8V
param 95mA
param 10130°
param 11Surface Mount
param 12528nm
param 13525nm
param 14-
param 15-
param 16-
param 170402
param 181.00mm L x 0.50mm W
param 190.45mm

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify VLMTG1501 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For VLMTG1501, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.