Home / Products / Vishay Siliconix / IRF9630SPBF

Vishay Siliconix IRF9630SPBF

MOSFET P-CH 200V 6.5A D2PAK

Answer first: this page is a purchasing reference for the exact part number IRF9630SPBF from Vishay Siliconix. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Vishay Siliconix Part number: IRF9630SPBF Package: TO-263-3, D2PAK (2 Leads + Tab), TO-263AB RFQ verification required

Key Parameters

Part NumberIRF9630SPBF
ManufacturerVishay Siliconix
CategoryFETs, MOSFETs
packageTO-263-3, D2PAK (2 Leads + Tab), TO-263AB
series-
packagingTube
product statusActive
param 1P-Channel
param 2MOSFET (Metal Oxide)
param 3200 V
param 46.5A (Tc)
param 510V
param 6800mOhm @ 3.9A, 10V
param 74V @ 250µA
param 829 nC @ 10 V
param 9±20V
param 10700 pF @ 25 V
param 11-
param 123W (Ta), 74W (Tc)
param 13-55°C ~ 150°C (TJ)
param 14-
param 15-
param 16Surface Mount
param 17TO-263 (D2PAK)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify IRF9630SPBF Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For IRF9630SPBF, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.